Search
Close this search box.
MON - FRI 8AM - 5PM
+1 (877) 897-6564

CASE STUDIES

Learn how leading institutions have reduced their energy costs and eliminated manual tube cleaning using the Helios TCS.

Duke University Case Study

In late 2019, Innovas Technologies and Duke University entered a partnership to install the Helios Tube Cleaning System on several chillers distributed throughout 3 different CCWP plants. The project involved 17 chillers providing 56,000 tons of district cooling for the Duke facilities infrastructure.

Read More

University of Virginia Case Study

District level utility systems serve the more than 18M square feet and include 11 central cooling plants, 6.27 miles of utility tunnels, and 220 miles of underground distribution lines. Centralized cooling plants serve 10M square feet from more than 45,000 tons of cooling capacity comprised of 39 chillers.

Read More

University of Nebraska Lincoln Case Study

As is frequently the case, a single Helios-equipped chiller would be compared with an identical “control” chiller operating operating without a tube cleaning system. Both chillers had to be in close-proximity and under the same environmental factors, to enable the best-possible measurement & verification (M&V) protocols.

Read More

START BUILDING YOUR SYSTEM

Configure your system based on number of chillers, pipe size, and get a custom quote. Designed and built in the United States, the Helios TCS system is constructed to thrive in the most challenging environments.

GET THE HELIOS BROCHURE

The award winning Helios TCS® is a breakthrough solution eliminating tube fouling in water-cooled heat exchangers. An automated preventative cleaning system.

SOCIAL MEDIA

Subscribe To Our Newsletter